HiTHIUM ∞Power 6.9MWh 8h Utility Energy Storage System
Price on Request
Packaging Capacity
Incoterm
Model No.
HiTHIUM ∞Power 6.9MWh 8h Utility Energy Storage System
HiTHIUM ∞Power 6.9MWh 8h Utility Energy Storage System
6.9MWh | 8-hour duration | Liquid-cooled container. This HiTHIUM product is engineered for stationary energy storage and is offered as part of a project-specific system or supply package.
Key Features
- Long-duration containerized system based on the 1300Ah 8-hour cell platform
- Low-noise operation with environmentally responsible refrigerant design
- Multi-stage active fire detection and protection architecture
- High-density system for renewable-energy shifting and grid support
Technical Specifications
| Rated Energy | 6.9MWh |
|---|---|
| Storage Duration | 8 hours |
| Module Configuration | 1P416S |
| Cooling Method | Liquid cooling |
| Communication | CAN / RS485 / Ethernet |
| Gravimetric Energy Density | ≥135 Wh/kg |
| Volumetric Energy Density | ≥160 Wh/L |
| Dimensions (L × W × H) | 6,058 × 2,438 × 2,896 mm |
| Cell Platform | HiTHIUM ∞Cell 1300Ah |
| Fire Protection Reference | Multi-stage active protection designed with reference to NFPA 855 |
Typical Applications
- 8-hour long-duration storage
- Renewable-energy shifting
- Grid capacity
- Utility peak management
Final electrical configuration, compatibility, performance guarantees, certifications, packaging and delivery terms are confirmed against the project design and destination requirements.
Download Center
FAQ
Please provide the required energy and power, charge and discharge duration, duty cycle, grid voltage, ambient conditions, installation altitude and applicable standards. The final configuration is confirmed during engineering review.
Packaging and loading quantities depend on the selected model, order volume, destination and project handling requirements. A project-specific packing plan is issued with the quotation.
The applicable certificate set depends on the model, destination market and final system configuration. Required compliance documents are confirmed before order placement.
Yes. Engineering review, balance-of-system integration, installation guidance, commissioning and after-sales scope can be included in the project quotation.
